Construction of the Outer Ring Tirana Lot 2
The Construction of the Outer Ring Tirana Lot 2 started on 05/2013 and was completed on 05/2017 by the DPSHTRR project with a limit fund of 2,327,885,980.8 ALL
Some other technical data during the project were made more than 316,930 m3 Excavation and transport, 198,540 m3 Fixing with gravel material, 22.381 tons Asphalt layer