Construction of “Paper-Vidhas” road (Lot 1)
The Construction of “Paper-Vidhas” road (Lot 1) started on 08/2004 and was completed on 09/2005 by the DPSHTRR project with a limit fund of 363,398,609 ALL
Some other technical data during the project were made more than 74,900 m3 Excavation and transport, 24,000 m3 Fixing with gravel material, 63,300 tons Asphalt layer