Construction of By-Pass road Plepa-Kavaja-Rrogozhina
The construction of the By-Pass Plepa-Kavaja-Rrogozhina road started on 12/2008 and was completed on 01/2011 by the DPSHTRR project with a limit fund of 587,808,133 ALL
Some other technical data during the project were made more than 41,807 m3 Excavation and transport, 18,418 m3 Fixing with gravel material, 25,557 m3 Road layer, 8,969 m3 Concrete works, 424 tons Steel works, 6,904 tons Asphalt layer, 3,064 tons Asphalt coating lawyer