Construction of the beach road, Spille – Kavaja
The Construction of the beach road, Spille – Kavaja started on 07/2005 and was completed on 04/2008 by the DPSHTRR project with a limit fund of 167,952,217 ALL
Some other technical data during the project were made more than 17,684 m3 Excavation and transport, 21,222 m3 Fixing with gravel material, 30,696 tons Asphalt layer