Construction of the Pjezga bridge
The Construction of the Pjezga bridge started on 07/2009 and was completed on 04/2013 by the DPSHTRR project with a limit fund of 151,694,206 ALL
Some other technical data during the project were made more than 11,969 m3 Excavation and transport, 5,004 m3 Fixing with gravel material, 1,885 tons Asphalt layer