Construction of the Pjezga bridge

The Construction of the Pjezga bridge started on 07/2009 and was completed on 04/2013 by the DPSHTRR project with a limit fund of 151,694,206 ALL

Some other technical data during the project were made more than 11,969 m3 Excavation and transport, 5,004 m3 Fixing with gravel material, 1,885 tons Asphalt layer

Construction Period 2009-07 2013-04
Client DPSHTRR
Equity 151,694,206 ALL
FOCUS

Albavia aims at excellence in all its projects. From design though construction to operation, all Albavia teams share the Company’s trademark qualities covering an exceptionally wide range of expertise which makes all the difference.

INFO BOX

Our services span all areas of the construction industry. We create added value for our clients by our specialised entities integrating the most diverse services and assuming responsibility for them. We bring together people, materials and machinery at the right place and at the right time in order to realise even complex construction projects – on schedule, of the highest quality and at the best price.

The first thing we build is relationships

Do you have a project to develop and do you need the advice of experts in the field? At Albavia we have the best experts with extensive experience in the field of construction who will assist you with your request.

CONTACT US